AGILE was first created for software development to replace what is known as the waterfall method but has since been applied to many other industries.
So what is AGILE?
AGILE is a strategy that promotes iterative and incremental design and development in order to get out parts of a project to the client instead of the whole at one time (to save time). This is actually very similar to the rapid development strategies – they are for the most part exactly the same.
When can I use AGILE
You should use AGILE when you meet some of the same requirements that you have to meet to do rapid instructional design. It is not something that should be used on every project. Certain conditions should be met first.
1. Analysis is completed – without a proper analysis the project will fail. 70% of projects fail and poor analysis and management are usually the cause. This doesn’t mean analysis needed to be completed for this part of the project. You might know these clients and have done other projects with them so you can take some/all of that original analysis and use it.
2. Constant access to SMEs, Developers, and Graphic Artists (and person who signs off – i.e., client)
3. Project can be rolled out in sections – for instance 1 module can be rolled out by itself without the other 10 modules
4. Already have learning objects from other projects (optional and very helpful – cuts time) – this is not required though but will save a significant amount of time
How do I use AGILE
Here is a concept map from learningsolutionsmag.com on how to use this process

Do you notice anything familiar about these? You should. They are just defining how to do steps in the ADDIE process. Here is the breakdown:
Align = Analysis
Get Set = Design and Development
Iterate and leverage = Implement
Evaluate = Evaluate
Updated 8/2018
]]>